Remaining Service Life


Is your network gaining or losing life each year?

Understanding Remaining Service Life (RSL) is critical to designing a treatment plan that stretches your budget further and reverses the trend of a deteriorating network.

CRITICAL CONCEPT

A 500-mile network loses 500 mile-years of life annually.

Every year, every mile of your network loses 1 mile-year of life. To avoid losing ground, the roadway owner must design a treatment plan that adds 500 mile-years of life or more!

See how this agency reallocated funds to inject more life
into their network, using the same budget

"Worst First" Approach

Many agencies are learning that the use of limited funds toward a “worst first” approach accelerates the decline of their overall network, as miles of good roads go untreated each year.

Scroll horizontally to view table

Treatment Type Lane-Miles Lane-Mile-Years Total Cost
Reconstruction 9 225 $2,883,618
Full Depth Remove & Replace 9 225 $2,883,618
Full Depth Reclaim + 4" HMA 0 0 $0
Base Stabilization + 4" HMA 0 0 $0
Rehabilitation 16 208 $1,737,283
3" Mill-and-Fill with HMA 8 120 $1,093,358
Cold Recycling + 1.5" HMA 0 0 $0
Hot Recycling + 1.5" HMA 0 0 $0
1.5" Mill-and-Fill with HMA 8 88 $643,925
Preservation 0 0 $0
Bonded Wearing Course 0 0 $0
Cape Seal 0 0 $0
Micro Surfacing (double lift) 0 0 $0
Chip Seal 0 0 $0
Slurry Seal 0 0 $0
Rejuvenating Fog Seal 0 0 $0
Crack Seal 0 0 $0
Totals: 25 433 $4,620,901
  • Total Network Lane-Miles
    1000
  • Total Lane-Mile-Years Lost Annually
    1000
  • Lane-Mile-Years Added
    433
  • Annual Network Deficit (-567)

Optimized Approach

Consider an Optimized approach, which reallocates funds across more efficient strategies to keep good roads good and help you get ahead of the curve.

Scroll horizontally to view table

Treatment Type Lane-Miles Lane-Mile-Years Total Cost
Reconstruction 4 100 $937,634
Full Depth Remove & Replace 0 0 $0
Full Depth Reclaim + 4" HMA 4 100 $937,634
Base Stabilization + 4" HMA 0 0 $0
Rehabilitation 8 104 $815,912
3" Mill-and-Fill with HMA 0 0 $0
Cold Recycling + 1.5" HMA 4 60 $459,289
Hot Recycling + 1.5" HMA 2 22 $195,642
1.5" Mill-and-Fill with HMA 2 22 $160,981
Preservation 192 900 $2,905,547
Bonded Wearing Course 2 20 $114,658
Cape Seal 10 100 $427,093
Micro Surfacing (double lift) 20 160 $643,925
Chip Seal 40 240 $676,778
Slurry Seal 40 200 $696,490
Rejuvenating Fog Seal 20 60 $110,059
Crack Seal 60 120 $236,544
Totals: 204 1,104 $4,654,093
  • Total Network Lane-Miles
    1000
  • Total Lane-Mile-Years Lost Annually
    1000
  • Lane-Mile-Years Added
    1104
  • Annual Network Gain 104

Ready To Optimize Your Network?

Are you injecting the most life into your network or are
you fighting a losing battle with a worst-first approach?