Cold In-Place Recycling
Find a Contractor/Supplier
Cost Benefits
- 20% - 40% faster construction than traditional rehab / reconstruction, which reduces delays and inconvenience to the travelling public
- Minimum 98% recycled material, saving 300+ truck movements on a typical job
- Almost 100% reduction in material costs (only paying for 1% - 4% new emulsion, cement and/or corrective aggregate if needed)
- 20% - 50% lower initial cost than traditional rehabilitation methods
- 60% - 80% lower maintenance needs compared to traditional rehabilitation methods
Factors that may Impact Cost
- Size of project
- Project Phasing: Multiple location projects vs. single location projects (5-mile job on 1 road vs. 1-mile job in 5 different places)
- Traffic staging (easier to do 1 lane the full job length, harder to do both lanes to the same point each day)
- Urban work (manholes / catch basins, intersection control add to cost) vs rural work
- Night work (costs more for labor but less traffic disruptions)
- Bidding/Tendering date vs. Completion date and number of working days
- Raw material pricing (emulsion / AC)
- Competitive bids (number of contractors in Region)
Decrease Cost Without Affecting Quality
- Doing geotech analysis to see if road is good candidate (drainage, subgrade, structure, etc)
- Provide mix design with letting
- Early letting closing (ideally Oct-Dec for the next year’s work)
- Clear, constructible specs
- Fair assignment of risk
- Consistent annual CIR program
Thank you for signing up for the PPRA mailing list!
If you created an account, you should receive an email shortly with more instructions to activate your account.