Acceptance Guidelines

Acceptance of the finished scrub seal is as follows:

  • For emulsion, acceptance is based on the sampling and testing for compliance with the requirements for the quality characteristics specified.
  • For aggregate, acceptance is based on the sampling and testing for compliance with the requirements for the quality characteristics specified. 
  • The following will be based on visual inspection or by other method specified after construction:
    • Uniform surface texture
    • Raveling or aggregate loss
    • Flushing
    • Streaking
  • Acceptance should not apply to identified areas where the existing surfacing, prior to application of scrub seal, contained defective areas as determined by the owner and the contractor.
  • Defective areas could be the following: excessive rutting or flushing