From civil & geotechnical engineers, to supplier and contractor, a qualified competent team is critical to success of the project
Mix designs should include durability and/or freeze thaw testing to ensure long term performance
A test strip on site should be used to verify that the contractor can produce a mixture that meets the requirements of the mix design and construction specifications